This Camas home's hallway bathroom got a remodel, and we handled the plumbing updates. The project involved camera scoping the existing drain system and installing new pipes for a tile shower. We also addressed the venting and drainage for the toilet and sink.
A bathroom remodel requires planning to update the plumbing system correctly. We started by camera scoping the existing drain system to identify potential issues and marked out the trench for the concrete cut. This step helps us avoid mistakes and install the system smoothly.
The new waste drain and vent system for the tile shower were piped and tied into the existing vent. We then tested the waste piping with a ten-foot head pressure. We also repiped the water supply and drainage for the undermount, double basin sink with garbage disposal. The drain was lowered to accommodate the new sink, and we redid the venting for the toilet and flange.
In addition to the shower updates, we made other plumbing fixes as part of the remodel. These updates included work on the shower valve and the installation of a new line for the filtered ice maker.
Drain System Update
We camera scoped the existing drain system and marked out the trench for the concrete cut. Then, we piped the new waste drain and vent system for the tile shower and tied in the existing vent. We tested the system with a ten-foot head pressure.
Shower Valve Rough-in
We roughed in the plumbing for the new shower valve, providing the necessary pipe and fittings. Note that the valve and trim were not included in this work.
Permit Fee
We paid the permit fee for the remodel project.
Venting Fix
We redid the venting for the toilet and flange as part of the remodel.
Water Supply and Drainage Update
We repiped the water supply and drainage for the undermount, double basin sink with garbage disposal. We lowered the drain to accommodate the new sink.
Filtered Ice Maker Installation
We installed a 1/4" poly line from the fridge to the kitchen sink for the filtered ice maker.
Washer Box Replacement
We replaced the existing washer box water supply and drain with a recessed washer box, excluding drywall work.
The hallway bathroom remodel is complete, with all plumbing updates finished and tested. The new systems are functioning properly, and the home is ready for use.